The hydraulic system of the locality of BIANOUAN in the department of ABOISSO interrupted for 6 months for pollution of the waters of the river BIA, was restarted this Thursday, 31 August 2017 in the presence of the local authorities, Mr. Norbert KOBENAN, General Director of Hydraulics at the Ministry of Economic Infrastructure and representative of Minister Amedé KOFFI, Mr. DA CRUZ, DGA of SODECI, and Mr. BOUAFOU Eugène, Director of the control of the exploitation and the quality at Onep who represented for the occasion the General Director of ONEP Mr. BERTE Ibrahiman.
This realisation with a capacity of 194.4 m3 and a daily production of between 190 and 200 m3, required more than one billion francs CFA (1,000,000,000) , but also reinforcement and adaptation works the whole of the existing system so that it is now able to treat this raw water, ridding it of all the impurities, to offer this valuable quality liquid to the populations.