The hydraulic system of the locality of BIANOUAN in the department ofABOISSO interrupted for 6 months for polluting the waters of the river BIA, was restarted this Thursday, August 31, 2017 in the presence of local authorities, Mr. Norbert KOBENAN, Director General of Hydraulics at the Ministry of Economic Infrastructure and representative of Minister Amedé KOFFI, Mr. DA CRUZ, DGA of SODECI, and Mr. BOUAFOU Eugène, Director of Operation and Quality Control at ONEP who represented ONEP Director General Mr. BERTE Ibrahiman for the occasion.
This structure with a capacity of 194,4 m3 for a daily production that varies between 190 and 200m3 required more than a billion (1 000 000 000) of our francs but also the work of strengthening and adapting the entire existing system so that it is now able to treat this raw water, by ridding it of all the impurities, to offer this precious quality liquid to the populations.